As requested, thread to mock my lack of time to get shit done and other things. It may not be needed but hopefully it keeps a fire lit under my ass. I took like a 7 year break on this project already lol.
>bathroom basement
>building a sub floor
>it sits on top of the concrete basement floor
>plywood with a plastic bottom (allows air flow undneath it)
>cement board and self leveling compound over that
>finished with cement patch to fix a few problem areas
>it has expansion room so it doesn’t crack as it heats up and cools down
>was gonna do tile but changed my mind to a resin pour floor
did the primer coat of epoxy resin (clear)
had to put on some spiked shoes and spread it around with a notched squeegee
I’ve got some spots to fix but that’s easy
next layer will be the metallic pigment
Tried to time it out so I could do the metallic colors but it took a few hours longer to cure than the directions said it was going to. By then I had to get to a soccer game then it was off to work. It’s the step I’m most excited for other than the second bathroom actually being usable.
Pass the god damn butter.
Comments
Outlet and junction boxes added.
1/2 the problem is ive now moved all my stuff in there lol. Im planning on getting some egress windows put in down there in the spring, and i want to sand the drywall, and knock a wall down, then do something similar with the floors.
I could really add a lot of space to my house by fixing up the basement.
I think im actually going to start working on the basement this weekend. The walls need a good sanding before painting, and then i want to paint the floor.